Constraints - the traditional scope, schedule, and cost.
约束——传统的范围、日程和成本。
From these four variables, fix time, cost, and quality — but not scope.
在这4个变量中,可以修改时间、成本和质量——但范围除外。
A. Scope of work, number of resources, cost.
工作范围,资源数量,成本。
B. Scope of work, cost, and time.
工作范围,成本,时间。
Effectively control the delivery scope, cost, schedule and quality.
对供货范围、成本、进度、质量等进行有效控制。
Freight cost is under the scope of buyer.
客户要求空运至印度孟买机场。运费是由买方支付。
Freight cost is under the scope of buyer.
客户要求空运至印度孟买机场。运费是由买方支付。
应用推荐