Chapter Six is a case study, in which a full-scope cost control plan is designed for a university as an example.
第六章:案例设计,以某高校为例设计一整套科研项目全成本管理方案。
Software projects rarely do as well as planned and, as a result, far too often we have to visit our iron triangle of scope, cost, and time.
软件项目很少能够做好计划,作为结果,我们最常见的就是在范围、费用和时间的铁三角中平衡。
Effectively control the delivery scope, cost, schedule and quality.
对供货范围、成本、进度、质量等进行有效控制。
应用推荐