Chapter Six is a case study, in which a full-scope cost control plan is designed for a university as an example.
第六章:案例设计,以某高校为例设计一整套科研项目全成本管理方案。
Software projects rarely do as well as planned and, as a result, far too often we have to visit our iron triangle of scope, cost, and time.
软件项目很少能够做好计划,作为结果,我们最常见的就是在范围、费用和时间的铁三角中平衡。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.
根据批准的变更控制与更新范围、费用、预算进度和质量要求,协调整个项目的变更。
应用推荐