迪那11井是继迪那-1井钻遇超高压盐水层卡钻报废后,新布的一口预探井。
Well Dina-11 is a newly planed exploratory well, as the former Dina-1 was abandoned because of pipe sticking in the salt-water formation with ultra-high pressure.
盐水从含水层中抽取到表面,与高压的二氧化碳混合并注入含水层的另一地点。
Brine is pumped from an aquifer to the surface to mix with moderately high-pressure CO2 and is reinjected at another point in the aquifer.
应用推荐