• 11继迪那-1高压盐水卡钻报废后,布的一口预探井

    Well Dina-11 is a newly planed exploratory well, as the former Dina-1 was abandoned because of pipe sticking in the salt-water formation with ultra-high pressure.

    youdao

  • 盐水含水抽取表面高压二氧化碳混合注入含水另一地点

    Brine is pumped from an aquifer to the surface to mix with moderately high-pressure CO2 and is reinjected at another point in the aquifer.

    youdao

  • 盐水含水抽取表面高压二氧化碳混合注入含水另一地点

    Brine is pumped from an aquifer to the surface to mix with moderately high-pressure CO2 and is reinjected at another point in the aquifer.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定