通过作用于刚性金属垫板上的一组液压千斤顶加载。
Loading was achieved through a battery of hydraulic jacks acting on a rigid metallic distribution plate.
在纠倾过程中采用了顶升纠倾横向加载推进法。
Propping transverse loading pushing approach was applied in the deviation rectification course.
对悬臂式抗滑桩,桩身位移随时间的延长不断增大,桩顶位移最大,加载至桩破坏时,其破坏面在拟滑面附近;
For cantilevered anti-slide pile, displacement of pile increase continuously with time, the topper displacement is max. The failure envelope is nearby design failure surface when load achieve extreme.
应用推荐