通过作用于刚性金属垫板上的一组液压千斤顶加载。
Loading was achieved through a battery of hydraulic jacks acting on a rigid metallic distribution plate.
在纠倾过程中采用了顶升纠倾横向加载推进法。
Propping transverse loading pushing approach was applied in the deviation rectification course.
对悬臂式抗滑桩,桩身位移随时间的延长不断增大,桩顶位移最大,加载至桩破坏时,其破坏面在拟滑面附近;
For cantilevered anti-slide pile, displacement of pile increase continuously with time, the topper displacement is max. The failure envelope is nearby design failure surface when load achieve extreme.
在加载条件下,欠压实带的顶、底壳发生剪切破裂,底壳早于顶壳。
In loading condition, the shear fracturing of the bottom shell of the uncompacted belt would appear earlier than that of the top.
高压加载系统用于给试验模型施加三维高地应力荷载,主要包括加载板和大吨位液压千斤顶。
The high-pressure loading system consisting of loading plates and the large-tonnage jacks is used to apply 3D high geostress for the test model.
高压加载系统用于给试验模型施加三维高地应力荷载,主要包括加载板和大吨位液压千斤顶。
The high-pressure loading system consisting of loading plates and the large-tonnage jacks is used to apply 3D high geostress for the test model.
应用推荐