这些量度的使用,必须集成到定义开发及维护过程中去,从而可以策划及追踪这些量度。
The use of these metrics must be integrated into defined development and maintenance processes so that they can be planned and tracked.
与之相反的是,当你有了一个很好定义的,策划驱动的过程时,反省并意味着苛刻。
By contrast, when you have a more defined, plan-driven process, reflection is not critical.
王世荣认为,自己并未参与整个策划过程,点燃引线用的火炬是徐威递给他的。
Wang said he was not involved with planning the fireworks display and only lit the fuse for the pyrotechnics after Xu handed him a torch.
应用推荐