通常称这种重新组织代码顺序消除暂停的技术为流水线调度(pipeline scheduling)或指令调度(instruction scheduling)。
基于24个网页-相关网页
流水线调度问题 Flow Shop Scheduling Problem ; FSP ; FSSP
动态流水线调度 dynamic pipeline scheduling
批量流水线调度问题 LFSP ; Lot-streaming flow shop scheduling Problem
而置换流水线调度问题 PFSP ; permu- tationflow-shopschedulingproblem
·2,447,543篇论文数据,部分数据来源于NoteExpress
研究了以最大完工时间为目标的零空闲流水线调度问题。
No-idle flow shop(NIFS) problem with makespan criterion is studied.
流水线作业是现代生产线最常用的技术,流水线调度问题是具有很强工程背景的典型NP完全问题。
The technology of pipeline is the most frequently used in modern product line. Pipeline problem is a typical NP-complexity problem with a solid background of the project.
对指令进行设置使它们可以充分利用处理器流水线的技术称为指令调度。
Setting up instructions so that they take full advantage of a processor's pipeline is called instruction scheduling.