• 研究了最大完工时间为目标的零空闲流水线调度问题

    No-idle flow shop(NIFS) problem with makespan criterion is studied.

    youdao

  • 流水线作业现代生产线常用技术流水线调度问题具有很强工程背景典型NP完全问题。

    The technology of pipeline is the most frequently used in modern product line. Pipeline problem is a typical NP-complexity problem with a solid background of the project.

    youdao

  • 指令进行设置使它们可以充分利用处理器流水线技术称为指令调度

    Setting up instructions so that they take full advantage of a processor's pipeline is called instruction scheduling.

    youdao

  • 方法给出冲突矩阵表示对象流入流水线限制通过启发式搜索寻找面向目标优化调度策略。

    The method gives out the presentation be constrained to objects into pipeline by using collision matrix, and findsout scheduling model with goal-oriented optimization by heuristic search.

    youdao

  • 一个实例进行了基于流水线技术调度结果表明多数机器都能够达到100%的最高运行效率

    An example is described, which exhibits the excellent scheduled results that most of the machines in the pipeline run in 100% efficiency.

    youdao

  • 一个实例进行了基于流水线技术调度结果表明多数机器都能够达到100%的最高运行效率

    An example is described, which exhibits the excellent scheduled results that most of the machines in the pipeline run in 100% efficiency.