拆模,选择分模面时,应考虑减小由于脱模斜度造成产品的大小端尺寸差异。如果产品较高,若型腔设在动模的一侧,则因脱模斜度造成产品的大小端尺寸差异较大,当产品不允许有较大脱模斜度时,采用此种结构必然使脱模困难。若产品外观无严格要求,可将分模面选在产品中间,它可以采用较小的脱模斜度,有得于脱模。
免拆模保温承重墙体系是一种新型的保温节能建筑结构体系。
The structural system of concrete bearing wall combined with insulating forms as heat-proof layers is a new type energy saving structural system of the bearing wall.
同条件养护试块不仅作为拆模的依据,而且也是判断结构实体混凝土强度的重要依据。
The specimen cured in atmosphere condition is not only the basis for removing the mould, but also the important basis for judging the concrete strength of structured entities.
气温急剧变化时不宜拆模。
Form removal shall not be carried out during rapid temperature change.
应用推荐