• 气温急剧变化时不宜拆模

    Form removal shall not be carried out during rapid temperature change.

    youdao

  • 混凝土完全硬化之前可以缩短周期时间

    Short cycle times can be achieved by detaching the mold plates before the concrete is completely set up.

    youdao

  • 拆模保温承重墙体系一种新型保温节能建筑结构体系。

    The structural system of concrete bearing wall combined with insulating forms as heat-proof layers is a new type energy saving structural system of the bearing wall.

    youdao

  • 拆模湿草席养护墙体各部位温度下降缓慢温度应力较小。

    But when the concrete is covered with wet straw, the temperature in walls decrease slowly and thermal stresses levels are lower.

    youdao

  • 沉降混凝土提前浇筑约在混凝土整体收缩完成80 %左右拆模

    The settlement joint belt has been poured previously and gained about 80% of concrete's complete shrinkage, and simultaneously the form stripping were carried out.

    youdao

  • 混凝土拌和真空脱水处理后,早期强度提高拆模时间提前,提高工效

    The concrete mixtures treated by vacuum water free can enhance the early stage strength, form release time and working efficiency.

    youdao

  • 条件养护试块不仅作为依据而且也是判断结构实体混凝土强度的重要依据。

    The specimen cured in atmosphere condition is not only the basis for removing the mould, but also the important basis for judging the concrete strength of structured entities.

    youdao

  • 试验表明拆模复合剪力屈服之前表现出良好的承载力,其破坏首先发生在连梁处,破坏时持续的时间长。

    The experiment results show that complex shear walls have excellent bearing capacity before yielding, and the duration between yielding to failure is longer.

    youdao

  • 简述建筑工程施工现场砼工程质量检查体会强调施工前检查、施工过程按规定控制拆模时跟踪检查的重要性。

    This paper states the experience of quality check of concrete engineering of architecture construction site and the importance of construction check, control and tracking check.

    youdao

  • 施工时变结构体系弹性特征拆模时间影响楼层承担最大施工荷载比率(荷载比率定义为结构承担荷载与楼板自重的比值);

    The elastic characteristic value of time-dependent structures and the time of shore removal, both have effects on the ratios of maximum construction loads borne by floors.

    youdao

  • 水平滑动折叠相比具有材料减少劳动强度、芯可反复利用无需整修的优点

    Compared level slip core mould with folding core mould, it has the advantages of saving material, reducing dismantle core Labour intensity and using core mould recycle but not rebuilding.

    youdao

  • 塑料壳适用于混凝土密肋楼盖,对IC厂房无尘车间孔密肋楼盖可技术进行系统阐述探讨施工要点及其控制方法

    Authors expound plastic formwork technology for open waffle slab of clean room in IC workshop systematically, and discuss the key problems in construction and controlling method.

    youdao

  • 主营轴承等铆合

    Main Sales: Bearing riveting die, demolition riveting sets of molds for tooling.

    youdao

  • 主营轴承等铆合

    Main Sales: Bearing riveting die, demolition riveting sets of molds for tooling.