压板安装后,进行面板的安装,将面板块轻轻地搁在横梁上向左右移动,推入到压板内。
Panel installation starts after pressure plate installation. Rest the panel gently on the transom and make it move right and left and them push it into the pressure plate.
将钢骨柱固定在专用胎架上,通过倒链滑移至安装点下方后,采用滑轮组和卷扬机进行提升就位。
Steel column is fixed to special jig, slipping below the installation position by chain block and lifting by pulley block and windlass.
一旦开始安装,先前的ROM将无法恢复。在安装过程中以及安装完毕后如果发生问题,可能需要将此设备送至O2客服中心进行维修。
Once being installed, previous ROM cannot be restored. Should problems happen during or after the installation, the device may require servicing in O2 service centres.