压板安装后,进行面板的安装,将面板块轻轻地搁在横梁上向左右移动,推入到压板内。
Panel installation starts after pressure plate installation. Rest the panel gently on the transom and make it move right and left and them push it into the pressure plate.
将钢骨柱固定在专用胎架上,通过倒链滑移至安装点下方后,采用滑轮组和卷扬机进行提升就位。
Steel column is fixed to special jig, slipping below the installation position by chain block and lifting by pulley block and windlass.
一旦开始安装,先前的ROM将无法恢复。在安装过程中以及安装完毕后如果发生问题,可能需要将此设备送至O2客服中心进行维修。
Once being installed, previous ROM cannot be restored. Should problems happen during or after the installation, the device may require servicing in O2 service centres.
所有的套件包下载后,将解压并进行安装。
After all the packages are downloaded they'll be unpacked and processed by the installer.
当新的呼梯盒和操作盘安装完毕后,将进行群控系统的安装。
New Landing and Car Operating Stations were installed and connected to the overlay control system.
将进行限定的详细试验,以评定安装好后控制的合适度,并确保各职能分开。
Limited detailed testing will be performed to assess the adequacy of controls in place and to ensure that there is proper segregation of duties.
将进行限定的详细试验,以评定安装好后控制的合适度,并确保各职能分开。
Limited detailed testing will be performed to assess the adequacy of controls in place and to ensure that there is proper segregation of duties.
应用推荐