变压器的垂直吊运与同变电室的其他高、低压配电柜同期进行,吊装前对吊装方案进一步论证和优化。
Vertical swinging of transformer and other high & low voltage switch boxes should be carried out simultaneously. Have further argument and optimization of hoisting plan before hoisting.
该铁路远动系统的调度管理对象是一个实验室变电所,两个模拟变电所的牵引供电设施,以及一个模拟盘。
The dispatching and managing targets of the railway remote control system is a substation of laboratory, the drawing power supply facilities of two simulation substations and a simulation plate.
电源状况:本工程的变电所设置在界区内的西北侧,其中包括10 KV分界室及变配电室。
V. power Supply Situation: transformer station of this project is set at the northwest side of the factory area, of which there is a 10kv separation room and a power distribution and transformer room.