变压器的垂直吊运与同变电室的其他高、低压配电柜同期进行,吊装前对吊装方案进一步论证和优化。
Vertical swinging of transformer and other high & low voltage switch boxes should be carried out simultaneously. Have further argument and optimization of hoisting plan before hoisting.
该铁路远动系统的调度管理对象是一个实验室变电所,两个模拟变电所的牵引供电设施,以及一个模拟盘。
The dispatching and managing targets of the railway remote control system is a substation of laboratory, the drawing power supply facilities of two simulation substations and a simulation plate.
电源状况:本工程的变电所设置在界区内的西北侧,其中包括10KV分界室及变配电室。
V. power Supply Situation: transformer station of this project is set at the northwest side of the factory area, of which there is a 10kv separation room and a power distribution and transformer room.
利用光缆传输系统实现变电站主控制室的上位机与现场的测量系统之间的通讯以提高系统整体抗干扰能力和信号传输的可靠性。
Optical cable is applied to communicate between measurement system near transformers and upper computer in main controlling room in order to improve reliability of monitoring system itself.
利用光缆传输系统实现变电站主控制室的上位机与现场的测量系统之间的通讯以提高系统整体抗干扰能力和信号传输的可靠性。
Optical cable is applied to communicate between measurement system near transformers and upper computer in main controlling room in order to improve reliability of monitoring system itself.
应用推荐