在正常情况下,这些提交的订单在对应的BOM和制造指令下达给制造厂之前要经历多个步骤。
In a successful case, the submitted orders go through various steps before the corresponding BOM and manufacturing instructions are submitted to the manufacturing plants for fulfillment.
然后他们向特定的资源发布工作指令,以此来部署他们的制造时间表。
They then deploy their manufacturing schedules by issuing work orders to dedicated resources.
生产部门检查需要生产的产品的制造时间表,并将生产指令的要求与现有的制造时间表进行匹配。
The production department checks the manufacturing schedule of items that need to be produced and matches the requirements of the production order with the existing manufacturing schedule.