事实上,在今年夏天CPS就已宣布,将在2018年首先关闭一家位于得克萨斯州境内,额定发电量为900兆瓦的燃煤发电厂。
This summer, in fact, CPS announced that it will shut down a 900mw coal-fired plant by 2018, a Texas first.
在维修任何美国瓦茨阀门之前,必须先通过关闭进口和出口关闭阀来实现水系统的关闭。
Prior to servicing any Watts valve, it is mandatory to shut down the water system by closing both the inlet and outlet shutoff valves.
布拉西?无可奉告。无论如何,你们都应该先问一下德拉·瓦莱。
应用推荐