test of turbine load trip 汽轮机甩负荷试验
turbine load error signal 汽轮机负载误差信号
steam turbine load 汽轮机负荷
turbine load rejection 水轮机甩负荷
steam turbine load shedding 汽轮机甩负荷
steam turbine load dump test 汽轮机甩负荷试验
base-load turbine 基荷汽轮机 ; 基本负荷汽轮机
no-load discharge of turbine 水轮机空载流量
high load turbine [动力] 高载荷透平
Load dump anticipation (LDA) function are one of the important steps to ensure the success of the steam turbine load dump test, and this circumstance is vary rare.
甩负荷预测功能是确保机组成功进行甩负荷的一项重要措施,大型汽轮机组中发生该功能失效的情况很少见。
Then taking the domestic 300MW steam turbine condenser as example, the effect of steam turbine load and cooling water temperature on cavitation surplus are calculated.
然后,以国产引进型300MW汽轮机凝汽器为例,计算汽轮机负荷及冷却水温度对水环真空泵汽蚀余量的影响。
How to decrease the overspeed while the steam turbine suddenly lose full load is one of the important problems to design the control system of the steam turbine.
如何降低甩负荷时汽轮机组的动态超速始终是汽轮机控制系统设计的重要任务之一。
应用推荐