steam turbine load shedding 汽轮机甩负荷
steam turbine load dump test 汽轮机甩负荷试验
load of steam turbine 汽轮机负荷
Load dump anticipation (LDA) function are one of the important steps to ensure the success of the steam turbine load dump test, and this circumstance is vary rare.
甩负荷预测功能是确保机组成功进行甩负荷的一项重要措施,大型汽轮机组中发生该功能失效的情况很少见。
Then taking the domestic 300MW steam turbine condenser as example, the effect of steam turbine load and cooling water temperature on cavitation surplus are calculated.
然后,以国产引进型300MW汽轮机凝汽器为例,计算汽轮机负荷及冷却水温度对水环真空泵汽蚀余量的影响。
How to decrease the overspeed while the steam turbine suddenly lose full load is one of the important problems to design the control system of the steam turbine.
如何降低甩负荷时汽轮机组的动态超速始终是汽轮机控制系统设计的重要任务之一。