concrete tower wall 混凝土塔壁
wetted-wall tower [化工] 湿壁塔
Great Wall Tower 长城大厦
wall tower 墙塔
Having adopted such technique, the tower wall construction speed was increased by 35% and the construction time was reduced by 17 days without increasing costs.
实施该工艺后,在未加大成本的前提下,提高筒壁施工速度35%,缩短工期17天。
应用推荐