Having adopted such technique, the tower wall construction speed was increased by 35% and the construction time was reduced by 17 days without increasing costs.
实施该工艺后,在未加大成本的前提下,提高筒壁施工速度35%,缩短工期17天。
Having adopted such technique, the tower wall construction speed was increased by 35% and the construction time was reduced by 17 days without increasing costs.
实施该工艺后,在未加大成本的前提下,提高筒壁施工速度35%,缩短工期17天。