Scope Verification and Quality Control 范围核实和质量控制
Most projects measure cost and time, but scope and quality affect cost and time and need to be measured as well.
大多数项目度量成本和时间,但是范围和质量影响了成本和时间,因此也需要度量。
In this initial step, we set the business scope and desired quality attributes of the reengineered system.
在此最初步骤中,我们设置再造工程系统的业务范围和所期望的质量属性。
In addition, a software development project generally has four variables: time, budget, scope, and quality.
此外,软件开发项目通常具有四个变量:时间、预算、范围和质量。
应用推荐