Chapter Six is a case study, in which a full-scope cost control plan is designed for a university as an example.
第六章:案例设计,以某高校为例设计一整套科研项目全成本管理方案。
The concept has multiple forms, and scholars and policymakers argue about the shape, scope and cost of the ideal program.
这一概念有多种形式,学者和政策制定者对理想项目的框架、范围和成本存在争议。
Constraints - the traditional scope, schedule, and cost.
约束——传统的范围、日程和成本。
应用推荐