Scope Change Control 范围变更控制 ; 范围变化控制 ; 范畴变更控制 ; 范围控制
Project Scope Change Control 项目范围变更控制
Scope Change Management 范围变更控制
Change in Scope 范围变更 ; 工作范围变化
Merge scope change 合并范围变动
Change Scope 改变范围 ; 更改范围 ; 变化范围
Scope of change 范围 ; 自适应性因素
change of business scope 调整业务范围
Scope and Change Control 范围与变更控制
This dissertation introduces a two-stage decision-making (TSDM) procedure and technique based on the scope change in Research and Development (R&D) projects in order to reduce the development risks and the failure rate for new products.
为了减少新产品的开发风险,降低新产品开发的失败率,本文就基于范围变更的研发项目的二次决策展开了研究。
参考来源 - 基于范围变更的研发项目的二次决策·2,447,543篇论文数据,部分数据来源于NoteExpress
The key here is timely: as soon as a scope change has been requested, not at the end of the project.
这里关键是要及时:范围变更的需求一提出,而不是等到项目结束。
A good design can help to avoid it, but even the best designs can't cover every contingency or scope change.
一个好的设计可以帮助避开这一点,但即便是最好的设计也无法应对所有可能的情况或作用域变化。
This will include sections on how the team will manage issues, scope change, risk, quality, communication, and so on.
包括团队应如何管理问题、范围变更、风险、质量及沟通等。
应用推荐