... Project Documentation 项目文档 Project Duration 项目工期项目持续时间 Project Engineer 项目工程师 ...
基于90个网页-相关网页
计划者必须估算:在不影响最后工期(project duration)的条件下,每一作业有多少严惩的时间,何种作业是任务的瓶颈(bottle neck),并据此布置计划中每一作业的起记时刻(scheme),以及人...
基于52个网页-相关网页
calculated project duration 计算工期
specifical project duration 要求工期
Project duration tight 工程工期紧
Required Project Duration 要求工期
project duration coordination 工期协调
Cost itself may be a product of other factors, including the project duration, resources, and environment.
费用本身也可能是产品的其它要素,包括产品工期,资源环境等。
The sensitivity of the size of resource to project duration becomes apparent from the results provided in Figs 5A–C.
敏感性的大小资源,以项目持续时间变得很明显了,从结果中提供的无花果5A条- C的。
The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.
项目快速跟进的目标是:提高生产效率减少项目历时提高进度跟踪控制降低项目风险。
specifically for the duration of the project whether it be a TV series or a one-off project,
特别是项目实施期间,无论是电视连续剧还是一次性项目,