• Would there be any which are discernible to emerge during project duration?

    在项目期间会出现任何可以发现的困难和问题吗?

    youdao

  • However, an increase in the size of the plumbing crew reduced the project duration to 229 days.

    不过,增加的大小管道船员减少了项目执行期已达229天。

    youdao

  • Cost itself may be a product of other factors, including the project duration, resources, and environment.

    费用本身也可能是产品的其它要素,包括产品工期,资源环境等。

    youdao

  • Abstract: The influencing factors of the source of construction project duration extension are complicated.

    [摘要]建设工程项目工程延期的影响因素错综复杂。

    youdao

  • This is a very simple and useful method in practice because it is not necessary to asunune a distribution of the project duration.

    该方法不需要对各工作延续时间的分布作出假定,因此具有广泛的实用性。

    youdao

  • The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.

    项目快速跟进的目标是:提高生产效率减少项目历时提高进度跟踪控制降低项目风险。

    youdao

  • The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.

    最佳大小的资源,所以被界定为最小尺寸的资源必须保持项目持续时间减少到最低限度。

    youdao

  • The increase in project duration normally translates into an increase in the cost of Labour as the Labour is deployed on daily wages basis.

    增加的项目期限通常转化为增加劳工成本,劳工若部署在日工资的基础上。

    youdao

  • The ideal pilot project sits at the confluence of project size, project duration, project importance, and the engagement of the business sponsor.

    理想的试点项目需要综合项目大小、项目持续时间、项目重要性以及业务发起人的参与度。

    youdao

  • For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.

    对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。

    youdao

  • In contrast of the two methods' results, this paper attempts to find reasonable plan duration and make reasonable proposals to the original project duration plan.

    对比两种方法的计算结果,尝试找到一个合理的计划工期,对工程原工期计划提出一定的建议。

    youdao

  • Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.

    研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型。

    youdao

  • One difference is that you can assert, for instance, that the plan-driven approach will extend our project duration from twelve to fourteen weeks, an increase of two weeks.

    区别之一就是您能够断言,例如计划驱动的方法将把您的项目周期从十二周扩展到十四周,增加了两周的时间。

    youdao

  • The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.

    然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。

    youdao

  • Of course, for the project to have acceptable risk, this must be done for each of the tasks, leading to almost doubling the duration.

    当然,对于拥有可接受的风险的项目来说,必须对每个任务都这样做,这将导致几乎将持续时间加倍。

    youdao

  • Project estimation tools provide estimates of effort and duration based on the available information.

    项目估算工具根据可用信息提供工作及持续时间的估计。

    youdao

  • You'll evaluate the remaining work to see if the project will be completed within the original effort, cost, and duration plans.

    你要评估那些剩余的工作,看看项目是否可以按照初始计划中估算的工时、成本以及期限完成。

    youdao

  • For example, the cost, effort, and duration of a project are at best educated guesses.

    例如,最好也不过是有根据地推测项目的成本、工作及持续时间。

    youdao

  • Many project managers have different "rules of thumb" for the maximum duration of any one task, but a common one is that most tasks should not exceed two weeks.

    对于任一任务的最大持续时间,许多项目经理都有不同的经验,但一般而言,大多数任务都不应超过两周。

    youdao

  • Now, consider how a project manager sets the duration of tasks in a project plan.

    现在,考虑项目经理如何设置项目计划中的任务持续时间。

    youdao

  • For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.

    例如,与项目成本或持续时间无关的度量标准不能帮助评估迭代中的方差削减。

    youdao

  • I. Duration - a short project would help skeptics to say that Agile works for small projects.

    持续时间—小项目会让人怀疑敏捷只对小项目有用。

    youdao

  • What is our current test creation velocity and what has it been for the duration of the project?

    我们当前的测试的创建速度是多少,以及在项目过程中曾经是多少?

    youdao

  • What is our current test execution velocity and what has it been for the duration of the project?

    我们当前的测试的执行速度是多少,以及在项目过程中曾经是多少?

    youdao

  • Therefore, any potential higher, up-front costs are more easily recovered over the duration of a project (see Sidebar).

    因此,在项目过程中,任何可能更高的、预先的成本都更容易回收(参见工具条)。

    youdao

  • Those in our industry understand how difficult it is to accurately determine up front the exact scope, cost, or duration of a significant project.

    这让我们知道,在我们行业中准确地制定一个重大项目功能范围,价格或者时间是非常困难的。

    youdao

  • Smaller companies are viewed as riskier partners that are vulnerable to the loss of key personnel and "may not have the financial muscle to survive for the duration of a project," the authors said.

    小公司容易被视作危险的合作者,因为他们很容易流失核心技术人员,还可能"缺乏足够的经济力量以在项目的开发周期中生存下来,"这位官员还说。

    youdao

  • The time spent properly planning the project will result in reduced cost and duration and increased quality over the life of the project.

    花些时间进行适当的规划可降低成本、缩短时间并提高项目生命周期内的质量。

    youdao

  • The time spent properly planning the project will result in reduced cost and duration and increased quality over the life of the project.

    花些时间进行适当的规划可降低成本、缩短时间并提高项目生命周期内的质量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定