The ideal pilot project sits at the confluence of project size, project duration, project importance, and the engagement of the business sponsor.
理想的试点项目需要综合项目大小、项目持续时间、项目重要性以及业务发起人的参与度。
One difference is that you can assert, for instance, that the plan-driven approach will extend our project duration from twelve to fourteen weeks, an increase of two weeks.
区别之一就是您能够断言,例如计划驱动的方法将把您的项目周期从十二周扩展到十四周,增加了两周的时间。
Abstract: The influencing factors of the source of construction project duration extension are complicated.
[摘要]建设工程项目工程延期的影响因素错综复杂。
For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。
Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.
研究了员工具有异质效率、最小化项目工期的项目调度问题,并建立了相应的整数线性规划模型。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。