The in-situ monitoring is made on the disturbance of soil induced by pipe jacking construction.
2.对顶管施工引起的土体扰动进行了现场监测,研究了顶管工程现场测试技术。
参考来源 - 顶管施工中土体性状及环境效应分析Finally,several control measures are proposed to avoid failure for long-distance linear and curvilinear pipe jacking construction.
提出了长距离直线和曲线顶管施工防止管道失稳的控制措施。
参考来源 - 期刊学术社区·2,447,543篇论文数据,部分数据来源于NoteExpress
Finally, several control measures are proposed to avoid failure for long-distance linear and curvilinear pipe jacking construction.
提出了长距离直线和曲线顶管施工防止管道失稳的控制措施。
It shows that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
研究结果表明,水平平行顶管施工时中间区域受到双重扰动,产生的地面沉降较大。
It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.
分析表明,水平平行顶管施工时由于中间区域受到双重扰动,会产生较大的地面沉降。
应用推荐