• Finally, several control measures are proposed to avoid failure for long-distance linear and curvilinear pipe jacking construction.

    提出了长距离直线和曲线顶管施工防止管道失稳的控制措施。

    youdao

  • It shows that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.

    研究结果表明,水平平行顶管施工时中间区域受到双重扰动,产生的地面沉降较大。

    youdao

  • It is shown that the ground settlement produced by middle zone is greater because of double disturbance during parallel pipe jacking construction.

    分析表明,水平平行顶管施工时由于中间区域受到双重扰动,会产生较大的地面沉降。

    youdao

  • As is shown in analytical calculation, ground deformation induced by pipe jacking construction is three-dimensional and changing with the jacking-in of shield.

    算例分析表明,顶管施工引起地面产生三维变形,随着掘进机的顶进而不断产生变化。

    youdao

  • Pipe jacking construction disturbs soil inevitably, which would results in soil deformation and does harm to its surroundings.

    顶管施工对土体扰动是不可避免的,土体变形是土体受扰动的结果,而土体变形则会对周围环境造成危害。

    youdao

  • Pipe jacking construction disturbs soil inevitably, which would results in soil deformation and does harm to its surroundings.

    顶管施工对土体扰动是不可避免的,土体变形是土体受扰动的结果,而土体变形则会对周围环境造成危害。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定