Shanghai metro line 1 上海地铁1号线
The test device has been applied to Shanghai metro line 1, with excellent results.
目前该测试装置已在上海地铁1号线投入使用,效果良好。
ANSYS software has been applied successfully in construction of deep foundation pit excavation in Shanghai South Station reconstruction project of Shanghai Metro Line No 1.
ANSYS软件已成功应用于上海地铁1号线上海南站车站改建工程地下结构的深基坑开挖施工工程中。
Mr Bi , having participated in construction of the North Extension project of Metro line 1 and Line 6 in Shanghai, is now Deputy Chief Engineer of Research Council, at Shanghai Shentong Holdings.
毕湘利,现任上海申通集团有限公司研究所副总工程师,曾参加上海地铁1号线北延伸段、6号线工程建设。
应用推荐