• The test device has been applied to Shanghai metro line 1, with excellent results.

    目前该测试装置上海地铁1线投入使用效果良好

    youdao

  • ANSYS software has been applied successfully in construction of deep foundation pit excavation in Shanghai South Station reconstruction project of Shanghai Metro Line No 1.

    ANSYS软件成功应用于上海地铁1线上海南站车站改建工程地下结构的基坑开挖施工工程中。

    youdao

  • Mr Bi , having participated in construction of the North Extension project of Metro line 1 and Line 6 in Shanghai, is now Deputy Chief Engineer of Research Council, at Shanghai Shentong Holdings.

    毕湘利,现任上海申通集团有限公司研究所副总工程师,曾参加上海地铁1线延伸6号线工程建设

    youdao

  • In addition, two years ago, the Shanghai metro line 1 car crash two side with the firm also signal about mistakes.

    除此之外,年前上海地铁1线侧面相撞事故公司信号错误有关

    youdao

  • Different people in the same place and the same time, Shanghai Metro Line 1, Hengshan Road Station.

    不同出现相同时间地点衡山上海轨道交通1线

    youdao

  • This article introduces grounding and insulation conditions of screen door system along Line 1 in Shanghai Metro.

    本文介绍上海地铁1线屏蔽系统接地绝缘情况,分析了地铁屏蔽门系统接地绝缘的原因。

    youdao

  • For the first time in China, the monolithic track bed connection is successfully carried out without interrupting train operation while Shanghai metro line 1 is under renovation.

    详细叙述整体道床拨接的技术难点和施工措施,介绍上海地铁1线上海南站改造工程国内首次实现了在中断地铁运营的情况下整体道床拨接的情况。

    youdao

  • I In Shanghai downtown area, Shanghai Line 4 will get through the existing Shanghai Stadium Station of Metro Line 1 to achieve the "T" interchange.

    提要:上海闹市区地铁4线线路穿越已建地铁1 号线上体车站实现两线站台T换乘

    youdao

  • The civil works of Shanghai metro No. 1 line was completed in spring of 1994. The metro stations are mainly built by diaphragm wall .

    上海地铁1线区间隧道采用盾构法施工,地下车站采用地下连续墙法施工,土木工程已于1994年全线竣工

    youdao

  • The event will start and finish at the Shanghai Science and Technology Museum, 2100 Century Ave. (Metro line 2, Shanghai Science and Technology Museum, exit 1).

    比赛起点终点上海科技博物馆世纪大道2100号。(地铁2号线,上海科技博物馆,1出口

    youdao

  • The project adjacent to Metro Line 1 Shanghai circus city station walk 5 minutes is up;

    项目紧邻地铁1线上海马戏步行5分钟

    youdao

  • The project adjacent to Metro Line 1 Shanghai circus city station walk 5 minutes is up;

    项目紧邻地铁1线上海马戏步行5分钟

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定