The Gezhouba Project is a large run-of-river hydropower plant with an installed capacity of 2715MW.
葛洲坝工程是建在中国长江(扬子江)上的一个大型径流式水电站,其装机容量为2715兆瓦。
Generally speaking, a system has an excellent chance of becoming CPU-bound if the CPU is 100 percent busy, has a large run queue compared to the number of CPUs, and more context switches than usual.
通常来说,如果某个系统的CPU是100%忙碌,并且相对于CPU的数目来说拥有大规模的运行队列,以及具有更为频繁的上下文切换,那么该系统很有可能成为CPU受限系统。
The big Pharma hasn't really done research for years but then he married in the biotech area and therefore biotech companies aren't that well run but they spent a great deal in research for the large molecule drugs.
大型制药企业已经很多年没有做过相关研究,但它却与生物技术领域合作,因此导致众多生物技术公司经业绩下降,但生物技术公司在大分子药物的研究上,却投入了很多。
应用推荐