Generally speaking, a system has an excellent chance of becoming CPU-bound if the CPU is 100 percent busy, has a large run queue compared to the number of CPUs, and more context switches than usual.
通常来说,如果某个系统的CPU是100%忙碌,并且相对于CPU的数目来说拥有大规模的运行队列,以及具有更为频繁的上下文切换,那么该系统很有可能成为CPU受限系统。
The Gezhouba Project is a large run-of-river hydropower plant with an installed capacity of 2715MW.
葛洲坝工程是建在中国长江(扬子江)上的一个大型径流式水电站,其装机容量为2715兆瓦。
The Gezhouba Project is a large run-of-river hydropower plant with an installed capacity of 2715MW.
葛洲坝工程是建在中国长江(扬子江)上的一个大型径流式水电站,其装机容量为2715兆瓦。
应用推荐