The former can be a good choice if most of your systems are homogeneous and you don't have specific needs for agility beyond the most common support cycles, of the products.
如果您的大多数系统都是同类型的,并且您对于产品在最常见的支持周期之外没有特殊的敏捷需求,前者可能是一个很好的选择。
For most it seems to go through 90 minute cycles, with 30 minutes of lower consciousness.
对大多数人而言,它的周期是90分钟,其中30分钟的意识低潮。
For a branch hint to be most effective (so that the branch does not stall at all), it must be set at least four instruction fetch-groups plus 11 cycles before the branch instruction.
要想让分支提示变得非常有效(这样分支就根本不会暂停了),就必须设置至少4个指令取出组和分支指令之前的11个周期。
应用推荐