span by span method 移动支架逐跨施工法 ; 逐跨工法
span by span construction method 逐跨施工法
span-by-span installation 逐跨拼装
span-by-span 逐跨坍塌
The success that Gonghe cable-stayed bridge is closed verified that the closure option and the calculation are right and provided valuable experience in practice for the extensive application of the span by span method in construction of the cable-stayed bridge.
公和斜拉桥合拢施工的成功,验证了合拢方案和计算的正确性,为移动模架法在斜拉桥施工中的广泛应用提供了宝贵的实践经验。
参考来源 - 公和斜拉桥合拢方案及其控制·2,447,543篇论文数据,部分数据来源于NoteExpress
Each span is 50 metres long, which was constructed with span by span method from south to north.
每跨50米,纵横向预应力体系;采用移动模架法自南向北逐跨施工。
In a complicated environment, a large workshop with special structure collapsed transversely span by span was blasting demolished.
介绍在复杂环境下,对一特殊结构大面积厂房采用横向逐跨坍塌爆破拆除的方案。
The Interval is half-open, meaning that the span of time encapsulated by the Interval includes the beginning of the span but excludes the end.
Interval为半开区间,这表示由Interval封装的时间跨度包括这段时间的起始时刻,但是不包含结束时刻。
应用推荐