span by span method 移动支架逐跨施工法 ; 逐跨工法
span by span construction method 逐跨施工法
span-by-span installation 逐跨拼装
span by span 逐孔
span-by-span construction 逐孔施工
span-by-span algorithm for straight line 以段为步长的直线算法
The success that Gonghe cable-stayed bridge is closed verified that the closure option and the calculation are right and provided valuable experience in practice for the extensive application of the span by span method in construction of the cable-stayed bridge.
公和斜拉桥合拢施工的成功,验证了合拢方案和计算的正确性,为移动模架法在斜拉桥施工中的广泛应用提供了宝贵的实践经验。
参考来源 - 公和斜拉桥合拢方案及其控制·2,447,543篇论文数据,部分数据来源于NoteExpress
Then, a span-by-span algorithm for straight line based on best approximation is deduced from these properties.
然后利用这些性质,提出了基于最佳逼近的以段为步长的直线算法。
The Interval is half-open, meaning that the span of time encapsulated by the Interval includes the beginning of the span but excludes the end.
Interval为半开区间,这表示由Interval封装的时间跨度包括这段时间的起始时刻,但是不包含结束时刻。
Each span is 50 metres long, which was constructed with span by span method from south to north.
每跨50米,纵横向预应力体系;采用移动模架法自南向北逐跨施工。
应用推荐