3) Different expectant targets determine different methods of determining reasonable cable force. Only making using of a certain method inevitably has disadvantage and shortcoming.
3)希望的成桥目标不同,确定斜拉桥成桥状态下合理索力的方法会有所不同,单一使用某种方法确定斜拉桥的成桥状态下的合理索力,不可避免地存在缺点和不足。
参考来源 - 斜拉桥成桥合理索力确定的综合方法·2,447,543篇论文数据,部分数据来源于NoteExpress
Thus, a reasonable cable force control could make the process of building or reinforcement faster, simpler and safer.
因此,在斜拉桥的施工、加固过程中合理控制斜拉索的索力可以使整个施工过程安全、快捷和简单的完成。
Calculation essence of reasonable cable force is equivalent to optimization calculation on force status of cable-stayed Bridges under dead weight.
合理成桥索力计算实质是斜拉桥恒载受力状态的优化计算。
On the other hand, the investigation about the reasonable cable tensions and the control force in the construction is presented in the thesis.
本文的另一个方面是进行斜拉桥合理索力和施工张拉力的探讨,即施工控制中的结构计算。
应用推荐