Thus, a reasonable cable force control could make the process of building or reinforcement faster, simpler and safer.
因此,在斜拉桥的施工、加固过程中合理控制斜拉索的索力可以使整个施工过程安全、快捷和简单的完成。
Calculation essence of reasonable cable force is equivalent to optimization calculation on force status of cable-stayed Bridges under dead weight.
合理成桥索力计算实质是斜拉桥恒载受力状态的优化计算。
On the other hand, the investigation about the reasonable cable tensions and the control force in the construction is presented in the thesis.
本文的另一个方面是进行斜拉桥合理索力和施工张拉力的探讨,即施工控制中的结构计算。
Rational cable force can guarantee the structure safety in construction and make the structure's internal force reasonable after construction.
斜拉索的索力合理与否直接决定了斜拉桥施工阶段结构的受力安全和成桥后结构内力的合理分布。
A reasonable status of the completed cable-stayed bridge include reasonable force state, and a reasonable linear state.
斜拉桥的合理成桥状态包括合理受力状态及合理线形状态。
The hybrid girder cable-stayed bridge has excellent dynamic and static mechanical properties. Therefore it's a bridge with reasonable force and beautiful layout.
其具有优良的动静力性能,是一种受力合理而美观的桥梁结构型式。
The hybrid girder cable-stayed bridge has excellent dynamic and static mechanical properties. Therefore it's a bridge with reasonable force and beautiful layout.
其具有优良的动静力性能,是一种受力合理而美观的桥梁结构型式。
应用推荐