We adopted different time steps for the calculation of the flow and temperature field, which improve the efficiency greatly.
通过对流场及温度场分别采用不同的计算域和时间步长,大大提高了计算效率。
A zone partitioning technique for the calculational area was developed to apply different time steps in different areas during the solidification simulation.
对不同的计算区域采用不同的时间步长进行计算,建立了分区域计算方法。建立了基于分数步长法的隐式差分方法。
According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.
根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(1 1)模型,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。
应用推荐