A zone partitioning technique for the calculational area was developed to apply different time steps in different areas during the solidification simulation.
对不同的计算区域采用不同的时间步长进行计算,建立了分区域计算方法。建立了基于分数步长法的隐式差分方法。
According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.
根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(1 1)模型,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。
According to the theory of grey system, the different time steps model of GM (1 1) in the pile foundation engineering is established, and a testing method of this model is provided.
根据灰色系统理论,首次建立了时间非等步长的桩基工程GM(1 1)模型,提出了时间非等步长的桩基工程GM(1 1)模型的检验方法。
应用推荐