即使装卸货仍在进行,但不算作装卸货时间内的时期。
Period that does not count as laytime even if loading or discharging is carried out.
由于修复操作工造成的损害消耗的时间计算在装卸货时间按或滞期时间之内。
Time lost for repairing stevedore damage is to count as laytime or time on demurrage.
在卸港由于等待泊位而损耗的时间,如果已开始起计装卸货时间,则计在装卸货时间之内。
Time lost due to waiting for berth available at Discharging Port, in case the laytime commences, shall be counted as the laytime.
应用推荐