• 即使装卸货仍在进行,但算作装卸时间内的时期。

    Period that does not count as laytime even if loading or discharging is carried out.

    youdao

  • 由于修复操作工造成的损害消耗的时间计算装卸货时间滞期时间之内。

    Time lost for repairing stevedore damage is to count as laytime or time on demurrage.

    youdao

  • 由于等待泊位而损耗的时间如果开始起计装卸货时间,则装卸货时间之内。

    Time lost due to waiting for berth available at Discharging Port, in case the laytime commences, shall be counted as the laytime.

    youdao

  • 船舶第一最后一个舱门而产生的时间除非船舶已经滞期,否则计算装卸货时间之内。

    Time lost in connection with the first opening and last closing of vessel hatches shall not count as laytime unless the vessel is already on demurrage.

    youdao

  • 船只应该指定装卸时间到达,并根据到达指令及规则卸

    Vessel will be arriving within as the designated lay days and will be discharged in principal in accordance with the order of arrival at Discharging Port.

    youdao

  • 提出解决时间窗口装卸货问题(PDPTW)的快速启发式算法

    A quick heuristic algorithm is proposed to solve the pickup and delivery problem with time Windows (PDPTW).

    youdao

  • 最后水尺测量损耗的时间计算装卸滞期时间之内;

    The time spent in connection with the final draft survey is to count as laytime or time on demurrage;

    youdao

  • 最后水尺测量损耗的时间计算装卸滞期时间之内;

    The time spent in connection with the final draft survey is to count as laytime or time on demurrage;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定