... air survey 航空测量;空中测量 Airport Core Programme 机场核心计划 Airport Railway Reserve 机场铁路专用区 ...
基于106个网页-相关网页
机场核心计划展览中心 Airport Core Programme Exhibition Centre
机场核心计划以外的北面跑道,则定于一九九八年底投入服务。
The northern runway, which is outside the ACP scope, is scheduled for operation in late 1998.
原来在机场核心计划作出。32,这个版本是墓室中的9毫米利森蒂轮。
Originally made in . 32acp, this version is chambered in the 9mm Glisenti round.
结果,多间国际公司投得机场核心计划合约,这些公司多以联营方式参与竞投。
A significant number of international companies have won ACP contracts, often as part of joint ventures.
应用推荐