在尾矿库中沿两条监测线布置钻孔,并埋设孔隙水压力传感器,由计算机系统以多种方式从传感器上采集数据。
Along the two monitoring lines holes were drilled on the dam and hole water pressure sensors were buried. Data were collected from these sensors in many ways through a computer system.
该工程施工与现场实时监测相结合,利用孔隙水压力、土体分层沉降和载荷试验等检测指标对加固效果进行了监测和检测。
Real time monitoring and inspecting are conducted during construction; improving effects are detected through pore water pressure, layer settlements and plate load tests etc.
通过对浃里陈大桥桥头试验段的真空度、地下水位、流量、孔隙水压力、地表沉降等现场监测结果的分析;
The observation results of the bridge head experimental site of Jialichen Bridge are analyzed such as vacuum degree, ground water table, flowrate, pore water pressure and surface settlement.
应用推荐