在尾矿库中沿两条监测线布置钻孔,并埋设孔隙水压力传感器,由计算机系统以多种方式从传感器上采集数据。
Along the two monitoring lines holes were drilled on the dam and hole water pressure sensors were buried. Data were collected from these sensors in many ways through a computer system.
该工程施工与现场实时监测相结合,利用孔隙水压力、土体分层沉降和载荷试验等检测指标对加固效果进行了监测和检测。
Real time monitoring and inspecting are conducted during construction; improving effects are detected through pore water pressure, layer settlements and plate load tests etc.
通过对浃里陈大桥桥头试验段的真空度、地下水位、流量、孔隙水压力、地表沉降等现场监测结果的分析;
The observation results of the bridge head experimental site of Jialichen Bridge are analyzed such as vacuum degree, ground water table, flowrate, pore water pressure and surface settlement.
内部孔隙水压力及土压力参数不适合作为崩岸的监测预测指标。
The parameter of the pore water pressure and soil pressure are unfitted as the monitoring and forecasting index for bank collapse.
以江阴长江公路大桥北锚碇为例,首先阐述了锚碇地基土孔隙水压力观测和渗透性分析的意义。并根据江阴长江公路大桥地基基础安全监测成果,分析了孔隙水与长江水的水力联系。
The importance to monitor the pore water pressure and to study the permeability of soil under the north anchorage of Jiangyin Yangtze River Highway Bridge is analyzed firstly.
对浃里陈大桥桥头试验段的孔隙水压力、分层沉降、地表沉降、土体水平位移等现场监测结果进行了分析;
The observation results of the Jialichen bridge-head experiment site such as pore water pressure, settlement of soil at various depths, surface settlement, and horizontal displacement are analyzed.
对浃里陈大桥桥头试验段的孔隙水压力、分层沉降、地表沉降、土体水平位移等现场监测结果进行了分析;
The observation results of the Jialichen bridge-head experiment site such as pore water pressure, settlement of soil at various depths, surface settlement, and horizontal displacement are analyzed.