Upon request, Contractor will provide the Owner with access to all relevant planning and scheduling documents throughout the duration of the project.
在项目执行过程中,根据要求,承包商要向业主提供所有相关的计划与进度资料。
Not required, the software will work it out for you after scheduling. Input duration and relationship only.
不需要,软件将为您计算。输入工期和关系。
For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.
对于复杂工程施工系统,工期一定、资源均衡的资源进度计划是需要解决的一个重要且有相当难度的问题。