• Upon request, Contractor will provide the Owner with access to all relevant planning and scheduling documents throughout the duration of the project.

    项目执行过程中,根据要求承包商业主提供所有相关计划进度资料

    youdao

  • Not required, the software will work it out for you after scheduling. Input duration and relationship only.

    需要软件计算。输入工期关系

    youdao

  • For complex engineering construction system, resource scheduling of limited project duration-resource leveling is an important and difficult problem.

    对于复杂工程施工系统工期一定、资源均衡资源进度计划需要解决的一个重要且有相当难度的问题。

    youdao

  • The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.

    然后,工期最小目标与工期-成本权衡目标建立关键识别方法模型,通过算例验证了方法的有效性

    youdao

  • Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.

    研究了员工具有异质效率最小化项目工期的项目调度问题建立了相应整数线性规划模型。

    youdao

  • Project scheduling with heterogeneous efficiency workforce to minimize project duration is considered, and the corresponding integer linear programming is presented.

    研究了员工具有异质效率最小化项目工期的项目调度问题建立了相应整数线性规划模型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定