CPM network planning CPM网络计划
A case study shows that the optimization model is superior to CPM network model.
实例验证结果表明,该优化模型优于CPM网络模型。
In this paper, we study the efficiency of total floats and single floats in CPM network and their applications in the project management.
本文研究CPM网络计划中总时差和单时差的使用效率问题及在项目管理中的应用。
Node slack is of great importance in CPM network, and it is the most intuitive and the simplest for computing and applications in a variety of slacks.
节点时差是CPM网络中一个重要的机动时间概念,在各种机动时间中最为直观,计算和应用起来最为简便。
应用推荐