A case study shows that the optimization model is superior to CPM network model.
实例验证结果表明,该优化模型优于CPM网络模型。
In this paper, we study the efficiency of total floats and single floats in CPM network and their applications in the project management.
本文研究CPM网络计划中总时差和单时差的使用效率问题及在项目管理中的应用。
Node slack is of great importance in CPM network, and it is the most intuitive and the simplest for computing and applications in a variety of slacks.
节点时差是CPM网络中一个重要的机动时间概念,在各种机动时间中最为直观,计算和应用起来最为简便。
The dynamic simulation model, which is hierarchical, takes CPM network as frames and calls complex CYCLONE simulation model enclosed in advance when needed.
全过程动态仿真技术以CPM网络模型作为框架,调用封装好的CYCLONE模型,形成一个分层次的模型结构。
At present, the study of the time-cost optimization is generally in the CPM network, and the traditional CPM network is not in line with the actual situation of the project.
目前,时间-费用优化问题的研究一般是在CPM网络中进行的,传统的CPM网络不符合项目进行过程中的实际情况。
At present, the study of the time-cost optimization is generally in the CPM network, and the traditional CPM network is not in line with the actual situation of the project.
目前,时间-费用优化问题的研究一般是在CPM网络中进行的,传统的CPM网络不符合项目进行过程中的实际情况。
应用推荐