The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
This paper introduces the construction practice of the high piers and columns of No. 12 Contract Section of Xiangyang-Shiyan Expressway.
本文就襄十高速公路第12合同段高墩柱施工实践谈几点体会。
The paper summed up the pile foundation construction technology in the 3-contract section and discussed the key steps for quality control on cast-in-place pile.
总结了京沪高铁三标段三工区桩基施工技术,并对灌注桩施工质量控制的几个关键环节进行了探讨。
应用推荐